....no birds have visited the feader so we remove the ice overhang
and jim finishes plastering the kitchen ceiling
Imake a start of painting the boarding in the hall
two of the bedroom walls plastered
the french doors are in
I wax the kitchen floor...this is an aid memoire
door frames are custom made on site
jim makes a start on the french door frame, having angle grinded a section out of the floor to accommodate the height of the doors ...many thanks for doing that dusty job.