Wednesday 26 August 2009

kitchen ceiling now complete
all beams treated

door frames square up the hall

fuse cupboard under construction

celebrity shed chef
rain will not stop BBQ!!






Thursday 20 August 2009

posts by mel are in verdana font...italic and stylish dark grey......jim has given up posting photo's...
;(
they say owners resemble their dogs.
the gable wall pointed

plasterboard continues....


the beams have finally all been sanded, it was a disgusting/hot/dusty/backbreaking job....the only job Mel could actually do Solo! apart from now finishing them.
wensley relaxes whenever /wherever possible.

all rooflights finally boarded.











works begin to disguise the breezeblock wall with a descrete timber structure, which will be jim's den...AKA the shed
we finally complete the 'leap of faith' entrance to the Lounge, with a conventional step.




jim relaxes with a refreshing can of cider, and pays homage to E17....
bathroom suite 'roughly' in place, everything to be mm perfect...to jims despair.
due to the highly sensitive nature of the building material, works were carried out under the cover of 'rain'.
After 4 days of preperation the mortar is brushed back.
wall under construction...breezeblocks add a touch of modernity to the 'twee build'
shed base- DONE....wall to begin
last gulley connected to manhole which was done in august 08'!
construction of shed base