Friday 15 August 2008

Some photos off my camera as opposed to Mels phone. 


Mel's a natural at it.

All loaded up and ready to go back to the hire company.
And then the rain came back and fill the holes. This is where the sewage pump will be installed. Pallet there to stop people falling in the 2m deep hole.



10mm pea gravel around the pipes


Leveling the road back to how it was.


unloading the digger
Beats doing it by hand.


Salvaged timbers form the fence. Wall needs a bit of sorting me thinks.

Wooded Nightshade growing amongst the works.


Guttering up.


My boat fits just nicely though the tri-folding doors.