Tuesday, 11 November 2008



Flooded again even after we had al the thresholds sorted so time for action. Dug round the perimeter and laid water channel for rising water to escape via. It then gets drained off into our sewage tank outside and pumped away. Oldroyd waterproof membrane is then laid over the whole area and sealed to for a tank. If this doesn't work we're stuffed.





In the meantime I had made another set of french doors and fitted them to the bedroom.








With the membrane in and taped up in the other room it was time to try and catch up a bit on the stud work in what will be the kitchen.

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home