Monday, 19 February 2007



This weekend we put the damp proof membrane down, the insulation (120mm polystyrene) and then a good four inch of concrete on top.
The pic of the hills is the view from the top of the granary steps. trees and bots get in the way a bit.

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home